Behind the building
6 June 2017

2017.06.06 behind the building

A day before the exhibition’s opening day, we went behind the building and see Maider Lopez’s amazing work. The bright, orange rope went through the building, interior and exterior.

We talked about the high-speed rail road in Serbia in the dinner table. Vladimir insist it’s an impossible task here. And we then realize it is not starting yet.